<rp id="uis4p"><ruby id="uis4p"><input id="uis4p"></input></ruby></rp>
  • <span id="uis4p"></span>
    1. <rp id="uis4p"><strike id="uis4p"></strike></rp>

        WELCOME TO SHANDONG DAZHONG MECHANICAL MANUFACTURING CO., LTD. HOME
       
      Sprocket
      Front Idler
      Roller
      Supporting wheel
      Cutting & End Bit
      Front Fork & Tooth
      DETAIL    
      Ten indexes of Management

      One goal: achieve profit
      Two foundations: Make budget and Target
      Three Flow: HR flow, Material flow and information flow
      Four ations: Assemblization, Stabilization, Standardization, Diversification.
      Five Improving Factors: Worker, Machine, Material, Method, Producing
      Six indexes: Producing capacity, Quality, Cost, Delivery, Safety, Morale
      Seven Wastes In:
      Producing, Transportation, Processing, Movement, Stock, Failure products, Waiting
      Eight Lost in:
      Breakdown time, Changing Moulds , Changing Knife , Machine warming, Lower speed, Bad changing, SD
      Nine Managements
      Raw material and semi finished products.
      Machine maintenance
      Volume, Quantity, position
      TPS
      SPC
      FMEA
      Walking Management
      Visual Management
      Scene Management
      Ten Action Shoulds:
      Prepared
      Fast
      Careful
      Organized
      Understand
      Positive
      Courage
      Briefly
      Improving
      Reporting

      Copyright ? 2018- SHANDONG DAZHONG MECHANICAL MANUFACTURING CO., LTD. Website´╝Üwww.shibidezc.com
      久久精品aⅴ无码中文字字幕不卡|av一本到久久免费|久久99精品久久久久久无毒不卡|欧美亚洲综合久久997

      <rp id="uis4p"><ruby id="uis4p"><input id="uis4p"></input></ruby></rp>
    2. <span id="uis4p"></span>
      1. <rp id="uis4p"><strike id="uis4p"></strike></rp>